| Well
conversion questions
If the pump on my well goes out and I'm within
180 feet of a water line, will I be required to connect to a municipal
water supply?
If the pump can be replaced with a pump rig, as opposed to a drill rig,
you will not be required to connect. If you're within 180 feet of a
water line, require a rig to repair your well AND there is financial
assistance available, then you will be required to connect to the municipal
water supply, assuming your permit is revocable and you use a domestic well or a community well.
If I am required to connect to a sewer system,
must I also connect to municipal water?
No. The two issues are completely separate. A mandatory sewer connection
does not automatically lead to a mandatory water connection.
How does the State Engineer know if a well has
been deepened or replaced?
The well driller must file a log of work done on the well with the Nevada
Division of Water Resources. Well drillers could lose their license
if they perform work on a well without submitting the required paperwork.
As it relates to the well
conversion grant program, what are "offsite costs?"
Offsite costs include all connection charges and fees required to bring
a service connection from the existing municipal water line in the street
to the meter box at the private property line (the costs include the
meter and the box).
How much does it cost to connect to a municipal
system?
Costs can vary widely based upon a number of factors, including the
meter size. You may contact the appropriate water purveyor—Las
Vegas Valley Water District (LVVWD), Henderson
or North
Las Vegas—for an estimate.
May I participate in the well conversion program if my well is in proper working order?
Yes, this is called a voluntary conversion.
May I participate in the well conversion grant
program if my property is more than 180 feet from an existing municipal
water line?
Yes. Under the program, the SNWA will
pay up to 85 percent of the first 180 feet of offsite costs associated
with a voluntary conversion (subject to available funding). Costs to
run any additional line beyond 180 feet must be paid fully by the voluntary
applicant.
How long does it take to complete a well conversion?
It only takes days to approve an application for connection. However,
it takes much longer to complete the actual work, which includes designing
the pipelines and other facilities, obtaining all the necessary permits
and rights-of-way, constructing the facilities and properly abandoning
and plugging the well. |